This layout was developed by some modeller friends to show just what you can achive in a limited space and on a limited budget and keep the scale to "Ho"
Basic operation is the transfer of logs down from the top of the mountain to the bottom for unloading. There is still some scenic areas to be finished. Track was good old Peco code 100 setrack points and flexi track. A basic Bachmann Dcc system is employed. The two main locos are old MANTUA stock that have been wired up with Dcc chips.